Wiest-Levy method
Contents |
[edit] Introduction
The Wiest-Levy method is a critical path method (CPM) based on the deterministic or exact duration of each task. CPM was developed by Morgan R Walker of the Engineering Services Division at Du Pont, and James E Kelley, who worked at Remington Rand. Walker and Kelly were interested in improving scheduling techniques used in the construction of industrial plants.
The Wiest-Levy method is a practical approach to problem solving that can be applied to ecision making. It sets out a way of deciding which jobs or activities involved in a complex project are higher priority (or critical) based on their overall impact. It also attempts to devise the ideal schedule for all jobs and resources required to meet time and budget targets.
[edit] History
Named after the American academics, Jerome D Wiest and Ferdinand K Levy, the Wiest-Levy method was introduced in the mid-1960s. A third collaborator, Gerald L Thompson was also involved in the development of this technique used to analyse, plan and schedule large, complex projects.
When applied to resource allocation and other aspects of project management in construction, this method helps to optimise the sequence of activities. Wiest created a concept called SPAR (Scheduling Program for Allocating Resources) which can be used for scheduling projects that have limited resources.
In the case of non-critical activities, the one that solves the problem with the least delay is chosen. If there are two activities with the same conditions, the one with the greatest leeway is delayed first, meaning that critical activities are only delayed when there is no other option.
For more information see: Critical path method.
[edit] Related articles on Designing Buildings Wiki
- Critical path method CPM.
- Progress of construction works.
- Resource leveling.
- Resource allocation in design and construction.
- Scheduling construction activities.
[edit] External resources
- F K Levy, G L Thompson and J D Wiest, Harvard Business Review, The ABCs of the Critical Path Method (September 1963).
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Guidance for conversion of traditional pre-1919 stone buildings.
Industrial heritage in the Ruhr
A marked difference to the fate of industrial landscapes in the UK.
Communities will be able to build their own clean energy.
Why diversity and inclusion matters for SMEs
CIOB’s D&I Charter shows how practical changes can support long-term growth.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.