Wiest-Levy method
Contents |
[edit] Introduction
The Wiest-Levy method is a critical path method (CPM) based on the deterministic or exact duration of each task. CPM was developed by Morgan R Walker of the Engineering Services Division at Du Pont, and James E Kelley, who worked at Remington Rand. Walker and Kelly were interested in improving scheduling techniques used in the construction of industrial plants.
The Wiest-Levy method is a practical approach to problem solving that can be applied to ecision making. It sets out a way of deciding which jobs or activities involved in a complex project are higher priority (or critical) based on their overall impact. It also attempts to devise the ideal schedule for all jobs and resources required to meet time and budget targets.
[edit] History
Named after the American academics, Jerome D Wiest and Ferdinand K Levy, the Wiest-Levy method was introduced in the mid-1960s. A third collaborator, Gerald L Thompson was also involved in the development of this technique used to analyse, plan and schedule large, complex projects.
When applied to resource allocation and other aspects of project management in construction, this method helps to optimise the sequence of activities. Wiest created a concept called SPAR (Scheduling Program for Allocating Resources) which can be used for scheduling projects that have limited resources.
In the case of non-critical activities, the one that solves the problem with the least delay is chosen. If there are two activities with the same conditions, the one with the greatest leeway is delayed first, meaning that critical activities are only delayed when there is no other option.
For more information see: Critical path method.
[edit] Related articles on Designing Buildings Wiki
- Critical path method CPM.
- Progress of construction works.
- Resource leveling.
- Resource allocation in design and construction.
- Scheduling construction activities.
[edit] External resources
- F K Levy, G L Thompson and J D Wiest, Harvard Business Review, The ABCs of the Critical Path Method (September 1963).
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIOB reacts to the announcement of Andy Burnham as Prime Minister.
Heritage and conservation science workforce survey - Have your say.
England's Suburbs 1820-2020. Book review.
New, more proportionate and targeted approach for higher-risk building assessments.
Government brings British Steel into public ownership.
UKCW Birmingham returns with bold new theme and focus.
New guidance published on competence requirements for self-certification schemes.
Construction Management, 8 July
NEETs crisis drives interest in trades, but apprenticeships barriers remain.
Passive fire protection webinar
MEP services penetration seals.
Where its at podcast (and video) - The role of the Architectural Technologist as an Expert Witness.
More than 200 remarkable buildings added to SAVE’s Buildings at Risk register.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.